Skip to main content

Blk 123 & 129 Tengah Drive/Plantation Crescent, 129 Tengah Drive

129 Tengah Drive, Singapore 690129 · by SP Mobility

Blk 123 & 129 Tengah Drive/Plantation Crescent, 129 Tengah Drive has 7 public EV charging points run by SP Mobility, at 129 Tengah Drive, Singapore 690129. They are 4 DC fast (up to 120 kW, from $0.8066 per kWh) and 3 AC (up to 22 kW, from $0.6976 per kWh). Right now 5 of 7 are available. Over the last 3 days it was usually quietest around 08:00–10:00 and busiest around 19:00. Its operator reported the charging points working 99.7% of the time. The nearest other charging location is Blk 123 & 129 Tengah Drive/Plantation Crescent, 123 Tengah Drive, 139 m away.

Available now
5of 7 available
Live · updated 23:35 SGT · every 5 min
DC fast · Combo 2120 kW
$0.8066 /kWh
4 of 4 available · fastest chargers here
AC · Type 222 kW
$0.6976 /kWh
1 of 3 available · best for a long stop

Best time to go: 08:00–10:00

About 7% of chargers in use then, against 50% around 19:00, the busiest hour.

Share of working chargers in use on a typical day, last 3 days since 9 Nov. Early estimate: it settles as more days come in.

Bar height: share of chargers in useBest time to goOther hoursOvernight (23:00–07:00), not picked
60%30%0%
00:0006:0012:0018:0023:00

Day-of-week view after 7 days of history

Charging points

As SP Mobility reports them to LTA
  • B1 173, 174
    DC · Combo 2 · 120 kW · $0.8066
    Available
    for 1h 15m
  • B1 173, 174
    DC · Combo 2 · 120 kW · $0.8066
    Available
    for 5h 55m
  • B1 191, 192
    DC · Combo 2 · 120 kW · $0.8066
    Available
    for 3h 15m
  • B1 191, 192
    DC · Combo 2 · 120 kW · $0.8066
    Available
    just changed
  • B1 157
    AC · Type 2 · 22 kW · $0.6976
    Available
    for 1h 45m
  • B1 158
    AC · Type 2 · 22 kW · $0.6976
    In use
    for 3h
  • B1 190
    AC · Type 2 · 22 kW · $0.6976
    In use
    for 1h 40m

Last 24 hours

Charging points by status, every 15 minutes (SGT).

Reliability

Last 3 days since 9 Nov, as SP Mobility reports to LTA
Reported uptime
99.7%
available or in use
Out of service
0.3%
reported by the operator
Not reporting
0.0%
no status in the feed
In use
28%
of working charging points