Skip to main content

Corporation Place

2 Corporation Road, Singapore 618494 · by SP Mobility

Corporation Place has 6 public EV charging points run by SP Mobility, at 2 Corporation Road, Singapore 618494. They are 4 DC fast (up to 100 kW, from $0.9483 per kWh) and 2 AC (up to 43 kW, from $0.8066 per kWh). Right now 6 of 6 are available. Over the last 3 days it was usually quietest around 20:00–22:00 and busiest around 17:00. Its operator reported the charging points working 99.8% of the time. The nearest other charging location is Revv, Corporation Drive, 289 m away.

Available now
6of 6 available
Live · updated 23:50 SGT · every 5 min
DC fast · Combo 2100 kW
$0.9483 /kWh
4 of 4 available · fastest chargers here
AC · Type 243 kW
$0.8066 /kWh
2 of 2 available · best for a long stop

Best time to go: 20:00–22:00

About 0% of chargers in use then, against 17% around 17:00, the busiest hour. Also quiet around 11:00 (0%).

Share of working chargers in use on a typical day, last 3 days since 9 Nov. Early estimate: it settles as more days come in.

Bar height: share of chargers in useBest time to goOther hoursOvernight (23:00–07:00), not picked
20%10%0%
00:0006:0012:0018:0023:00

Day-of-week view after 7 days of history

Charging points

As SP Mobility reports them to LTA
  • L1 35 & 36 Located at Loading & Unloading Bay
    DC · Combo 2 · 100 kW · $0.9483
    Available
    for 7h 25m
  • L1 35 & 36 Located at Loading & Unloading Bay
    DC · Combo 2 · 100 kW · $0.9483
    Available
    for 6h 25m
  • B1 156, 157
    DC · Combo 2 · 50 kW · $0.9483
    Available
    for 7h
  • B1 172, 173
    DC · Combo 2 · 50 kW · $0.9483
    Available
    for 9h 40m
  • B1 156, 157
    AC · Type 2 · 43 kW · $0.8066
    Available
    for 17h 35m
  • B1 172, 173
    AC · Type 2 · 43 kW · $0.8066
    Available
    for 2h 10m

Last 24 hours

Charging points by status, every 15 minutes (SGT).

Reliability

Last 3 days since 9 Nov, as SP Mobility reports to LTA
Reported uptime
99.8%
available or in use
Out of service
0.2%
reported by the operator
Not reporting
0.0%
no status in the feed
In use
5%
of working charging points

Price changes

  • Lot L1 35 & 36 Located at Loading & Unloading Bay changed to $0.9483/kWh11 Nov, 00:05
  • Lot L1 35 & 36 Located at Loading & Unloading Bay changed to $0.9483/kWh11 Nov, 00:05
  • Lot B1 172, 173 changed to $0.9483/kWh11 Nov, 00:05
  • Lot B1 156, 157 changed to $0.9483/kWh11 Nov, 00:05