Skip to main content

Tampines Connection

2 Tampines North Drive 4, Singapore 529434 · by SP Mobility

Tampines Connection has 4 public EV charging points run by SP Mobility, at 2 Tampines North Drive 4, Singapore 529434. They are 2 DC fast (up to 120 kW, from $0.9483 per kWh) and 2 AC (up to 22 kW, from $0.8066 per kWh). Right now 4 of 4 are available. Over the last 3 days it was usually quietest around 10:00–16:00 and busiest around 18:00. Its operator reported the charging points working 99.7% of the time. The nearest other charging location is Blk 662 Tampines Street 64 Tampines Greenglen, 250 m away.

Available now
4of 4 available
Live · updated 23:50 SGT · every 5 min
DC fast · Combo 2120 kW
$0.9483 /kWh
2 of 2 available · fastest chargers here
AC · Type 222 kW
$0.8066 /kWh
2 of 2 available · best for a long stop

Best time to go: 10:00–16:00

About 0% of chargers in use then, against 10% around 18:00, the busiest hour. Briefly quieter around 07:00 (0%), but busier either side.

Share of working chargers in use on a typical day, last 3 days since 9 Nov. Early estimate: it settles as more days come in.

Bar height: share of chargers in useBest time to goOther hoursOvernight (23:00–07:00), not picked
15%7.5%0%
00:0006:0012:0018:0023:00

Day-of-week view after 7 days of history

Charging points

As SP Mobility reports them to LTA
  • B1 C31 & C32
    DC · Combo 2 · 120 kW · $0.9483
    Available
    for 38h 30m
  • B1 C31 & C32
    DC · Combo 2 · 120 kW · $0.9483
    Available
    for 6h 30m
  • B1 C29
    AC · Type 2 · 22 kW · $0.8066
    Available
    for 42h 50m
  • B1 C30
    AC · Type 2 · 22 kW · $0.8066
    Available
    for 11h 25m

Last 24 hours

Charging points by status, every 15 minutes (SGT).

Reliability

Last 3 days since 9 Nov, as SP Mobility reports to LTA
Reported uptime
99.7%
available or in use
Out of service
0.3%
reported by the operator
Not reporting
0.0%
no status in the feed
In use
1%
of working charging points

Price changes

  • Lot B1 C31 & C32 changed to $0.9483/kWh11 Nov, 00:10
  • Lot B1 C31 & C32 changed to $0.9483/kWh11 Nov, 00:10