Skip to main content

Blk 127/135, 141/151 Bedok Reservoir Road Eunos Spring

147 Bedok Reservoir Road, Singapore 470147 · by Strides YTL

Blk 127/135, 141/151 Bedok Reservoir Road Eunos Spring has 12 public EV charging points run by Strides YTL, at 147 Bedok Reservoir Road, Singapore 470147. All are 12 AC (up to 7.4 kW, from $0.6976 per kWh). Right now 9 of 12 are available. Over the last 3 days it was usually quietest around 18:00–20:00 and busiest around 07:00. Its operator reported the charging points working 99.8% of the time. The nearest other charging location is Blk 145A Bedok Reservoir Road, 62 m away.

Available now
9of 12 available
Live · updated 23:50 SGT · every 5 min
AC · Type 27.4 kW
$0.6976 /kWh
9 of 12 available · best for a long stop

Best time to go: 18:00–20:00

About 1% of chargers in use then, against 28% around 07:00, the busiest hour. Briefly quieter around 15:00 (0%), but busier either side.

Share of working chargers in use on a typical day, last 3 days since 9 Nov. Early estimate: it settles as more days come in.

Bar height: share of chargers in useBest time to goOther hoursOvernight (23:00–07:00), not picked
40%20%0%
00:0006:0012:0018:0023:00

Day-of-week view after 7 days of history

Charging points

As Strides YTL reports them to LTA
  • L1 517
    AC · Type 2 · 7.4 kW · $0.6976
    Available
    for 13h 30m
  • L1 518
    AC · Type 2 · 7.4 kW · $0.6976
    In use
    for 1h 25m
  • L1 519
    AC · Type 2 · 7.4 kW · $0.6976
    Available
    for 35h 15m
  • L1 520
    AC · Type 2 · 7.4 kW · $0.6976
    Available
    for 2d 11h
  • L1 521
    AC · Type 2 · 7.4 kW · $0.6976
    Available
    for 14h 5m
  • L1 522
    AC · Type 2 · 7.4 kW · $0.6976
    In use
    for 20m
  • L1 523
    AC · Type 2 · 7.4 kW · $0.6976
    In use
    for 2h 20m
  • L1 524
    AC · Type 2 · 7.4 kW · $0.6976
    Available
    for 21h 30m
  • L1 525
    AC · Type 2 · 7.4 kW · $0.6976
    Available
    for 1h 30m
  • L1 526
    AC · Type 2 · 7.4 kW · $0.6976
    Available
    for 2d 13h
  • L1 527
    AC · Type 2 · 7.4 kW · $0.6976
    Available
    for 13h 45m
  • L1 528
    AC · Type 2 · 7.4 kW · $0.6976
    Available
    for 22h 35m

Last 24 hours

Charging points by status, every 15 minutes (SGT).

Reliability

Last 3 days since 9 Nov, as Strides YTL reports to LTA
Reported uptime
99.8%
available or in use
Out of service
0.2%
reported by the operator
Not reporting
0.0%
no status in the feed
In use
13%
of working charging points