Citibank Raffles City Shopping Centre
252 North Bridge Road, Singapore 179103 · by SP Mobility & Tesla
Citibank Raffles City Shopping Centre has 14 public EV charging points run by SP Mobility and Tesla, at 252 North Bridge Road, Singapore 179103. They are 8 DC fast (up to 250 kW, from $0.90 per kWh) and 6 AC (up to 22 kW, from $0.8066 per kWh). Right now 14 of 14 are available. Over the last 3 days it was usually quietest around 07:00–09:00 and busiest around 20:00. Its operator reported the charging points working 99.2% of the time. The nearest other charging location is Chijmes, Victoria Street, 117 m away.
Best time to go: 07:00–09:00
About 3% of chargers in use then, against 34% around 20:00, the busiest hour. Also quiet around 22:00 (5%). Quietest overall is overnight, 01:00–04:00 (0%).
Share of working chargers in use on a typical day, last 3 days since 9 Nov. Early estimate: it settles as more days come in.
Day-of-week view after 7 days of history
Charging points
- B3 3514-3518DC · Combo 2 · 250 kW · $0.90Availablefor 25m
- B3 3514-3518DC · Combo 2 · 250 kW · $0.90Availablefor 3h 5m
- B3 3514-3518DC · Combo 2 · 250 kW · $0.90Availablefor 3h 5m
- B3 3514-3518DC · Combo 2 · 250 kW · $0.90Availablefor 2h 30m
- B3 3401 AND 3DC · Combo 2 · 100 kW · $0.9483Availablefor 2h
- B3 3401 AND 3DC · Combo 2 · 100 kW · $0.9483Availablefor 1h 30m
- B3 3335, 3336DC · Combo 2 · 50 kW · $0.9483Availablefor 3h
- B3 3335, 3336DC · Combo 2 · 50 kW · $0.9483Availablefor 1h 15m
- B3 3333AC · Type 2 · 22 kW · $0.8066Availablefor 1h 50m
- B3 3334AC · Type 2 · 22 kW · $0.8066Availablefor 1h 35m
- B3 3337AC · Type 2 · 22 kW · $0.8066Availablefor 1h 15m
- B3 3400AC · Type 2 · 22 kW · $0.8066Availablefor 2h 40m
- B3 3403AC · Type 2 · 22 kW · $0.8066Availablefor 2h
- B3 3514-3518AC · Type 2 · 22 kW · –Availablefor 3h 10m
Last 24 hours
Charging points by status, every 15 minutes (SGT).
Reliability
Price changes
- Lot B3 3335, 3336 changed to $0.9483/kWh11 Nov, 00:05
- Lot B3 3335, 3336 changed to $0.9483/kWh11 Nov, 00:05
- Lot B3 3401 AND 3 changed to $0.9483/kWh11 Nov, 00:05
- Lot B3 3401 AND 3 changed to $0.9483/kWh11 Nov, 00:05