跳过主要内容

Blk 307 Tengah Drive Parc Clover Parc Clover @ Tengah

307 Tengah Drive, Singapore 690307 · by SP Mobility

Blk 307 Tengah Drive Parc Clover Parc Clover @ Tengah has 8 public EV charging points run by SP Mobility, at 307 Tengah Drive, Singapore 690307. They are 2 DC fast (up to 120 kW, from $0.8066 per kWh) and 6 AC (up to 22 kW, from $0.6976 per kWh). Right now 6 of 8 are available. Over the last 4 days it was usually quietest around 14:00–17:00 and busiest around 22:00. Its operator reported the charging points working 99.4% of the time. The nearest other charging location is Blk 322 Tengah Drive Parc Woods @ Tengah, 249 m away.

Available now
6of 8 available
Live · updated 00:10 SGT · every 5 min
DC fast · Combo 2120 kW
$0.8066 /kWh
2 of 2 available · fastest chargers here
AC · Type 222 kW
$0.6976 /kWh
4 of 6 available · best for a long stop

Best time to go: 14:00–17:00

About 9% of chargers in use then, against 31% around 22:00, the busiest hour. Briefly quieter around 11:00 (8%), but busier either side.

Share of working chargers in use on a typical day, last 4 days since 9 Nov. Early estimate: it settles as more days come in.

Bar height: share of chargers in useBest time to goOther hoursOvernight (23:00–07:00), not picked
50%25%0%
00:0006:0012:0018:0023:00

Day-of-week view after 7 days of history

Charging points

As SP Mobility reports them to LTA
  • L3B 87/89
    DC · Combo 2 · 120 kW · $0.8066
    Available
    for 4h 15m
  • L3B 87/89
    DC · Combo 2 · 120 kW · $0.8066
    Available
    for 5h 20m
  • L3B 90
    AC · Type 2 · 22 kW · $0.6976
    In use
    for 1h 40m
  • L3B 91
    AC · Type 2 · 22 kW · $0.6976
    Available
    for 2h 45m
  • L3B 92
    AC · Type 2 · 22 kW · $0.6976
    In use
    for 4h 50m
  • L3B 93
    AC · Type 2 · 22 kW · $0.6976
    Available
    for 14h 30m
  • L3B 94
    AC · Type 2 · 22 kW · $0.6976
    Available
    for 55m
  • L3B 95
    AC · Type 2 · 22 kW · $0.6976
    Available
    for 25m

Last 24 hours

Charging points by status, every 15 minutes (SGT).

Reliability

Last 4 days since 9 Nov, as SP Mobility reports to LTA
Reported uptime
99.4%
available or in use
Out of service
0.6%
reported by the operator
Not reporting
0.0%
no status in the feed
In use
24%
of working charging points