跳过主要内容

Blk 700A Pasir Ris Drive 10 Multi Storey Car Park

700A Pasir Ris Drive 10, Singapore 511700 · by CDG ENGIE

Blk 700A Pasir Ris Drive 10 Multi Storey Car Park has 3 public EV charging points run by CDG ENGIE, at 700A Pasir Ris Drive 10, Singapore 511700. All are 3 AC (up to 7.4 kW, from $0.695 per kWh). Right now 2 of 3 are available. Over the last 4 days it was usually quietest around 17:00–19:00 and busiest around 22:00. Its operator reported the charging points working 99.5% of the time. The nearest other charging location is Blk 631A Pasir Ris Drive 3 Multi Storey Car Park, 230 m away.

Available now
2of 3 available
Live · updated 00:10 SGT · every 5 min
AC · Type 27.4 kW
$0.695 /kWh
2 of 3 available · best for a long stop

Best time to go: 17:00–19:00

About 11% of chargers in use then, against 42% around 22:00, the busiest hour. Briefly quieter around 07:00 (10%), but busier either side.

Share of working chargers in use on a typical day, last 4 days since 9 Nov. Early estimate: it settles as more days come in.

Bar height: share of chargers in useBest time to goOther hoursOvernight (23:00–07:00), not picked
50%25%0%
00:0006:0012:0018:0023:00

Day-of-week view after 7 days of history

Charging points

As CDG ENGIE reports them to LTA
  • L2 89
    AC · Type 2 · 7.4 kW · $0.695
    In use
    for 3h 30m
  • L2 90
    AC · Type 2 · 7.4 kW · $0.695
    Available
    for 50m
  • L2 91
    AC · Type 2 · 7.4 kW · $0.695
    Available
    for 35m

Last 24 hours

Charging points by status, every 15 minutes (SGT).

Reliability

Last 4 days since 9 Nov, as CDG ENGIE reports to LTA
Reported uptime
99.5%
available or in use
Out of service
0.5%
reported by the operator
Not reporting
0.0%
no status in the feed
In use
30%
of working charging points