Blk 114A Lorong 3 Geylang MSCP
114A Lorong 3 Geylang, Singapore 382114 · by Charge+
Blk 114A Lorong 3 Geylang MSCP has 10 public EV charging points run by Charge+, at 114A Lorong 3 Geylang, Singapore 382114. All are 10 AC (up to 7.4 kW, from $0.649 per kWh). Right now 10 of 10 are available. Over the last 4 days it was usually quietest around 10:00–13:00 and busiest around 18:00. Its operator reported the charging points working 100.0% of the time. The nearest other charging location is Blk 114 Lorong 3 Geylang, 132 m away.
Best time to go: 10:00–13:00
About 1% of chargers in use then, against 3% around 18:00, the busiest hour. Briefly quieter around 22:00 (0%), but busier either side.
Share of working chargers in use on a typical day, last 4 days since 9 Nov. Early estimate: it settles as more days come in.
Day-of-week view after 7 days of history
Charging points
- L2A 72 & 73AC · Type 2 · 7.4 kW · $0.649Availablefor 35m
- L2A 72 & 73AC · Type 2 · 7.4 kW · $0.649Availablefor 35m
- L2A 84 & 85AC · Type 2 · 7.4 kW · $0.649Availablefor 5h 50m
- L2A 84 & 85AC · Type 2 · 7.4 kW · $0.649Availablefor 5h 50m
- L2A 95 & 96AC · Type 2 · 7.4 kW · $0.649Availablefor 3d 13hNo change in 3+ days: feed may be stale
- L2A 95 & 96AC · Type 2 · 7.4 kW · $0.649Availablefor 3d 6hNo change in 3+ days: feed may be stale
- L1 -AC · Type 2 · 3.7 kW · $0.649AvailableNo change in 3+ days: feed may be stale
- L1 -AC · Type 2 · 3.7 kW · $0.649Availablefor 2h 50m
- L1 -AC · Type 2 · 3.7 kW · $0.649AvailableNo change in 3+ days: feed may be stale
- L1 -AC · Type 2 · 3.7 kW · $0.649Availablefor 2d 5h
Last 24 hours
Charging points by status, every 15 minutes (SGT).